ARCHIVED – March 14-15, 2018 – Ottawa, Ontario

Copyright Notice

Copyright in the material contained in the webcasts is vested in the Crown. Extracts from this webcast may be reproduced for individual use without permission provided the source is fully acknowledged. However, reproduction in whole or in part for purposes of resale or redistribution requires prior written permission from the Canadian Nuclear Safety Commission.

Public Hearing March 14, 2018
Date Duration Download
(MP4)
Stream
(MP4)
Download: 1. Opening remarks, 2. Adoption of the Agenda, 3. Public Hearing Part 1: Bruce Power Inc., Request to renew the Nuclear Power Reactor Operating Licence for the Bruce Nuclear Generating Station A and B: Presentation by Bruce Power Inc. Stream: 1. Opening remarks, 2. Adoption of the Agenda, 3. Public Hearing Part 1: Bruce Power Inc., Request to renew the Nuclear Power Reactor Operating Licence for the Bruce Nuclear Generating Station A and B: Presentation by Bruce Power Inc.
Download: 1. Opening remarks, 2. Adoption of the Agenda, 3. Public Hearing Part 1: Bruce Power Inc., Request to renew the Nuclear Power Reactor Operating Licence for the Bruce Nuclear Generating Station A and B: Presentation by CNSC staff Stream: 1. Opening remarks, 2. Adoption of the Agenda, 3. Public Hearing Part 1: Bruce Power Inc., Request to renew the Nuclear Power Reactor Operating Licence for the Bruce Nuclear Generating Station A and B: Presentation by CNSC staff
Download: 1. Opening remarks, 2. Adoption of the Agenda, 3. Public Hearing Part 1: Bruce Power Inc., Request to renew the Nuclear Power Reactor Operating Licence for the Bruce Nuclear Generating Station A and B: Round of questions 4. Closing Stream: 1. Opening remarks, 2. Adoption of the Agenda, 3. Public Hearing Part 1: Bruce Power Inc., Request to renew the Nuclear Power Reactor Operating Licence for the Bruce Nuclear Generating Station A and B: Round of questions

 

Commission Hearing March 15, 2018
Date Duration Download
(MP4)
Stream
(MP4)
Download: 1. Opening remarks, 2. Adoption of the Agenda, 3. Approval of Minutes: Commission Meeting held on December 13 and 14, 2017, Commission Meeting held on January 23, 2018 Stream: 1. Opening remarks, 2. Adoption of the Agenda, 3. Approval of Minutes: Commission Meeting held on December 13 and 14, 2017, Commission Meeting held on January 23, 2018
Download: 4. Status Report, 4.1 Status Report on Power Reactors: Presentation by CNSC Staff, Round of Questions Stream: 4. Status Report, 4.1 Status Report on Power Reactors: Presentation by CNSC Staff, Round of Questions
Download: 5. Event Initial Reports, 5.1 Bruce Power: Failure of the primary heat transport pump seals at Bruce A Nuclear Generating Station Unit 4:Presentation by CNSC Staff, Presentation by Bruce Power, Round of questions Stream: 5. Event Initial Reports, 5.1 Bruce Power: Failure of the primary heat transport pump seals at Bruce A Nuclear Generating Station Unit 4:Presentation by CNSC Staff, Presentation by Bruce Power, Round of questions
Download: 5. Event Initial Reports, 5.2 Ontario Power Generation: Darlington Refurbishment Retube Waste Processing Building – Internal Contamination Event: Presentation by CNSC Staff, Round of questions Stream: 5. Event Initial Reports, 5.2 Ontario Power Generation: Darlington Refurbishment Retube Waste Processing Building – Internal Contamination Event: Presentation by CNSC Staff, Round of questions
Download: 6. Decision Items on Regulatory Documents, 6.1 REGDOC-1.1.1, Site Evaluation and Site Preparation for New Reactor Facilities: Presentation by CNSC Staff, Round of questions Stream: 6. Decision Items on Regulatory Documents, 6.1 REGDOC-1.1.1, Site Evaluation and Site Preparation for New Reactor Facilities: Presentation by CNSC Staff, Round of questions
Download: 6. Decision Items on Regulatory Documents, 6.2 REGDOC-2.1.1, Safety Culture: Presentation by CNSC Staff, Round of questions Stream: 6. Decision Items on Regulatory Documents, 6.2 REGDOC-2.1.1, Safety Culture: Presentation by CNSC Staff, Round of questions
Download: 7. Event Initial Report, 7.1 20/20 ND Technology Inc.: Potential dose limit exceedance for a certified exposure device operator (CEDO): Presentation by CNSC Staff, Round of questions Stream: 7. Event Initial Report, 7.1 20/20 ND Technology Inc.: Potential dose limit exceedance for a certified exposure device operator (CEDO): Presentation by CNSC Staff, Round of questions
Download: 7. Event Initial Report, 7.2 20/20 ND Technology Inc.: Industrial radiography vehicle fire – No damage to exposure device Presentation by CNSC Staff, Round of questions Stream: 7. Event Initial Report, 7.2 20/20 ND Technology Inc.: Industrial radiography vehicle fire – No damage to exposure device Presentation by CNSC Staff, Round of questions
Download: 7. Event Initial Report, 7.3 Windsor Regional Hospital Exceedance of a regulatory dose limit by a nuclear energy worker during a diagnostic nuclear medicine procedure: Presentation by CNSC Staff, Round of questions Stream: 7. Event Initial Report, 7.3 Windsor Regional Hospital Exceedance of a regulatory dose limit by a nuclear energy worker during a diagnostic nuclear medicine procedure: Presentation by CNSC Staff, Round of questions
Download: 8. Information Item, Status of Designated Officer Program: 2016: Presentation by CNSC Staff, Round of Questions, 9. Closing of meeting Stream: 8. Information Item, Status of Designated Officer Program: 2016: Presentation by CNSC Staff, Round of Questions, 9. Closing of meeting
Date modified: